OPS TRACKER: W3 · RFS & EMFF

Rotating field system & EMFF formation flight · /operations/w3

● LIVE/operations/w3Backend: /w3/dataRömer Industries / EMASSC
▶ ACTIVE TASKS
Formation A — 3-node spin optimisation @12rpm
W3 Dataspace → RFS field sim
IN PROGRESS
EMFF phase offset calibration — 120° separation
Feeding W2 Luke II EM config
IN PROGRESS
Power budget closure — 45kW vs W6 power spec
Awaiting W6 asset power data
BLOCKED
Spin Rate12rpm
B Field0.05T
Formation Sep80m
Power45kW
✓ COMPLETIONS
Baseline field projection — single-ship config
Archived to W6 Asset Library
COMPLETE
Phase sync — Formation B, 3 nodes validated
Config sent to W2 EMFF
COMPLETE
▶ QUEUED
Large-scale power sweep — 5kW to 200kW
Awaiting W6 power data
QUEUED
■ MISSION LOG
24 FebW3→W2 EM config sent
23 FebFormation A test completed
22 FebW6 power spec requested
21 FebPhase offset calibration v2
18 FebINIT W3 RFS&EMFF activated
■ CONNECTIONS
Feeds → W1, W2, W4
Consumes ← W5, W6

W3 • RFS & EMFF Field Projections

Free-draw coil layouts, frequency sweeps, optimized extraction per regolith class.

Coil Geometry Sketch

Frequency Sweep

Field Lines Preview

Data & Exports

Open /data/w3
Embed Block
Add an embed URL or code. Learn more

In here have each items EMFF overview and capacitance/range and all safety specs. include a complete saefty analysis of surrounding area and energy recapturing device further all procedures and operating manuals for AI to utilise and build upon

Interplanetary Supply Chain - Romer Industries

Romer Industries has developed a complete interplanetary supply chain that integrates asteroid mining with Earth-Moon economic systems. Our comprehensive approach covers every step from initial prospecting to final delivery, creating a sustainable and profitable space resource utilization network.

Supply Chain Flow

Your browser does not support the canvas element.

Complete Supply Chain Process

1

Prospect & Claim

Mission Secured Deployment (MSD): Deploy Mark III units to identify and claim valuable asteroids. Each successful claim is registered with EMASSC and logged in our secure registry for legal protection and future tokenization.

Duration: 6-12 months Technology: Mark III probes
2

Extract Resources

RFS + EMFF Operations: Use Resonant Frequency Sifting and Electromagnetic Field Filtering to extract high-value materials. The non-contact method ensures efficient extraction while preserving asteroid structural integrity.

Efficiency: 95%+ recovery Target: Platinum, rare earths
3

Transport & Relay

Interplanetary Logistics: Extracted materials are processed into standardized containers and transported via efficient trajectory planning. Our relay stations provide refueling and storage capabilities at key orbital positions.

Transit: 12-18 months System: Luke re-entry capsules
4

Process & Refine

Orbital Processing: Materials undergo initial refinement at lunar or orbital facilities before final delivery. This reduces transport costs and enables just-in-time delivery to Earth markets or space construction projects.

Location: L4/L5 stations Capacity: 1000 tons/year
5

Market Integration

Earth-Moon Commerce: Processed materials enter terrestrial and lunar markets through established distribution networks. Digital tokenization enables real-time trading and transparent pricing across the supply chain.

Markets: Earth, Luna, orbital Integration: Digital trading

Essential Infrastructure Components

🛰️

Mining Platforms

Mark III and future Mark IV/V autonomous mining platforms equipped with RFS and EMFF systems for efficient asteroid resource extraction.

  • Autonomous operation capability
  • Self-maintenance systems
  • Multi-asteroid deployment
🚀

Transport Vessels

Luke-class re-entry capsules and specialized cargo ships designed for efficient interplanetary material transport with minimal losses.

  • Heat-resistant cargo bays
  • Precision landing systems
  • Reusable design architecture

Relay Stations

Strategic orbital stations at Lagrange points providing refueling, storage, and communication relay services for the supply chain network.

  • L4/L5 positioning
  • 1000+ ton capacity
  • Solar power systems
🏭

Processing Facilities

Orbital and lunar refinement facilities that add value to raw materials and prepare them for terrestrial and space-based markets.

  • Zero-gravity manufacturing
  • Quality assurance systems
  • Just-in-time production

Strategic Partnerships

Mission Control & Navigation

Saber Astronautics: Provides advanced mission control systems and trajectory optimization for our mining operations, ensuring efficient resource allocation and risk management.

Technology Development

Wolfpack Startup Support: Accelerates development of next-generation mining technologies and provides expertise in scaling operations from prototype to commercial deployment.

Regulatory Compliance

EMASSC Integration: Earth-Moon Asteroid Supply & Services Corp ensures all operations comply with international space law and maintains our legal claims registry.

Supply Chain Metrics

95%
Resource Recovery Rate
Efficiency of RFS+EMFF extraction
18
Months Average Transit
Asteroid to Earth delivery time
99.7%
Delivery Success Rate
Successful cargo delivery
$850
Cost per KG
Total supply chain cost
Previous
Previous

Inter-planetary Supply Chain Network

Next
Next

Geostationary Luke II